About Us
Culture
Organizational
Honor
Event
¡¤ Forged Fittings
¡¤ Butt Welding Fittings
¡¤ Light Fittings
¡¤ Pipe
¡¤ Equipment Factory
Search

NOV.18. 2004 JUDD established and held the first board meeting to examine and approve the article of association/board ,on the meeting Mr.Xinbao . Zhang had beed appointed Chairman and General Manager.
June 2005 JUDD had a one¨Ctime through the ISO9001 quality system accreditation
Jan 2006 JUDD established the ¡°JUDD EQUIPMENT¡±,produced complete equipment for pipe fittings
Jan 2006 JUDD became a member of China National Petroleum Corperation First Class Serving Network Certification
Feb 2006 All elbows Manufacturing adopted the Mandrel-Forming technique

June 2006 JUDD successfully passed the first time verification by ISO9001 quality system
June 2006 JUDD had a one-time through the (PED97/23/EC) and (AD2000-WO) accreditation
Aug 2006 JUDD purchased the Qualitative Spectroanalysis instrument.Raw material management improved
Jan 2007 JUDD became a member of China JILIN Petroleum Corporation Serving Network Certification
May 2007 JUDD established foreign trade department ,integrated with the world market
June 2007 JUDD assessed as ¡°Grade -AA¡± credible enterprise by Industrial and Commercial Bank of China
Sep 2007 Trademark ¡°JUDD¡±successfully registered
Dec 2007 JUDD get self-governed foreign trade franchise

June 2009 JUDD successfully passed the IS09001 quality system verification
Oct 2008 CNC Plasma Cutting Machine was to be put into service
Dec 2008 JUDD EQUIPMENT had developed CNC Plasma Blanking Machine , and put it into service
Mar 2009 JUDD putted multifunctional teaching device into use
Mar 2009 Jiangshu JUDD Pipeline Industry Co.,Ltd launched
Apr 2009 JUDD carred out staff training programes
June 2007 JUDD assessed as ¡°Grade -AAA¡± credible enterprise by Industrial and Commercial Bank of China
JUDD successfully passed the first time verification by ISO9001 quality system
June JUDD Board examined and approved JUDD culture

July 2009 JUDD formulated new qualification document
July 2009 JUDD formulated employee handbook and executed
Sep 2009 JUDD attended China International Nuclear Power Industry Expo 2009

April 2010 JUDD had a one-time through the GOST R system accreditation
May 2010 JUDD attended Metallurgy-Litmash,Tube Russia,Aluminium/Non-Ferrous 2010
August 2010 physics lab puts into service
September 2010 to participate in the Shanghai TUBE CHINA fittings Exhibition
The 2010-10-1 Dafeng, Jiangsu Judd Machinery is investing
October 3, 2010 Jiang Su Judd Pipeline Industry Co., Ltd. plant Chun workers receipt and inspection of the equipment installation and commissioning
November 2010 to participate in the Beijing International Tube

Warm congratulations Jiang Su Judd Pipeline Industry Co., Ltd.The the ion straight seam automatic welding machine with international advanced level CNC formally put into production in May 2010, at the same time the CNC plasma curve (elbow) automatic welding machine into the production and commissioning phase.
Warm congratulations Jiang Su Judd Pipeline Industry Co., Ltd.With the international advanced level CNC plasma CNC plasma curve (elbow) automatic welding machine is put into operation in May 2012.

September 2012 to participate in the Shanghai TUBE CHINA fittings Exhibition